LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
This Question refers to the case of 'Narmada Electricals Ltd.' : The disposal of material was done on ________ basis.
Correct Answer
Weight
Your Answer
Weight
Select The Blank
Question
This Question refers to the case of 'National Engineering Co.' : GM commented that every department in this company competes with others in matter of ________.
Correct Answer
Inefficiency
Your Answer
Inefficiency
Select The Blank
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in execution of project leads to cost ________.
Correct Answer
Overrun
Your Answer
Overrun
True/False
Question
This Question refers to the case of 'Artwood Products' : It is necessary to keep stock of standard furniture to cater to sudden requirement of the customers.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
This Question refers to 'Automotive Gears Private Limited' : The company, for its various items, has recently introduced the concept of :-
Correct Answer
Economic lot size
Your Answer
Economic lot size
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Narmada Electricals Ltd.' : Other material considered to be scrap/obsolete is :-
Correct Answer
Packing material , Maintenance spares , Parts/components
Your Answer
Packing material , Maintenance spares , Parts/components , Electric motors
True/False
Question
This Question refers to the case of 'Kerson Automobiles' : MD has agreed to carry out modification of existing plant.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
This Question refers to the case of Narmada Electricals Ltd.: G.M. recruited a senior purchase manager, Mr. Sajid Durrani in the purchased department :-
Correct Answer
In view of need to procure parts/components for development in time
Your Answer
In view of need to procure parts/components for development in time
Multiple Choice Single Answer
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Following was the solution conceived by the Production Manager to the need of increasing production:-
Correct Answer
Introduction of incentive scheme
Your Answer
Introduction of incentive scheme
Select The Blank
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Overtime must be ________ to guarantee the success of the wage incentive scheme.
Correct Answer
Eliminative
Your Answer
Eliminative
Multiple Choice Multiple Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is manufactured in house, following costs wll increase:-
Correct Answer
Cost of power , Cost of labour , Cost of consumables like grease, lubricant
Your Answer
Cost of power , Cost of labour , Cost of consumables like grease, lubricant , Fixed overheads
Multiple Choice Single Answer
Question
This Question refers to the case of 'The Geer Company' : The purchase of steel was done exclusively by :-
Correct Answer
One buyer
Your Answer
One buyer
Multiple Choice Single Answer
Question
This Question refers to the case of 'Kerson Automobiles' : Cars are manually pushed over the wooden stand placed in the major repairs section because of :-
Correct Answer
Absence of the underground pit
Your Answer
Absence of the underground pit
True/False
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Under Scanlon Plan employee is paid incentive bonus based on individual efforts and additional output.
Correct Answer
True
Your Answer
True
True/False
Question
This Question refers to the case of 'The Geer Company' : During the period of rapid expansion, it became necessary to subcontract a significant volume of machining operations.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
This Question refers to the case of 'K.T Gears' : The groove cutting operation is performed at the :-
Correct Answer
Capston lathe
Your Answer
Capston lathe
Multiple Choice Single Answer
Question
This question refer to the case on "Allied Industries Pvt Ltd" : Following cost element is considered while calculating total cost of buying :-
Correct Answer
Transport cost
Your Answer
Transport cost
Multiple Choice Multiple Answer
Question
This Question refers to the case 'Indus Foundries Ltd.' :Following items are readily available at all the three locations :-
Correct Answer
Raw materials , Scrap , Foundry chemicals
Your Answer
Raw materials , Scrap , Foundry chemicals , Manpower
Match The Following
Question
Correct Answer
Your Answer
Capacity cost
Unabsorbed overheads
Unabsorbed overheads
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Power cost
Variable over head
Variable over head
Setup cost
Fixed labour cost
Marginal cost
Material cost
Direct cost
Direct cost
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Northern Machinery Limited' : As per Materials Manager basis of awarding contract is :-
Correct Answer
Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P.
Your Answer
Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P. , Case to case basis
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the Activity description given in the table, Preparation of operational layout activity affects following activities :-
Correct Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge
Your Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge , Manufacture hobbing fixture
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Kerson Automobiles' : As per the MD, the company is faced with following problems :-
Correct Answer
Union leaders do not work , Lower efficiency of the mechanics, as they do not work at their place of work , Union leaders waste their time
Your Answer
Union leaders do not work , Lower efficiency of the mechanics, as they do not work at their place of work , Union leaders waste their time , Unsatisfactory layout
Multiple Choice Single Answer
Question
The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing of 500 nos of stay bolt. In the manufacturing process grinding operation is carried out on following machine :-
Correct Answer
Cylindrical grinder
Your Answer
Cylindrical grinder
Select The Blank
Question
This Question refers to the case of 'Artwood Products' : Entire shop floor was ________ due to piles of work in progress.
Correct Answer
Congested
Your Answer
Congested
Multiple Choice Single Answer
Question
This Question refers to the case of 'Hansa Tractomotive Ltd.' : The machines were completed by Kay Jee :-
Correct Answer
Within the stipulated delivery period
Your Answer
Within the stipulated delivery period
Select The Blank
Question
This Question refers to the case of 'Kerson Automobiles' : The pedestal grinder mounted on the huge work table, gives out ________ and blows out dust.
Correct Answer
Sparks
Your Answer
Sparks
Multiple Choice Single Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Process sheet for exhaust manifold provides following information:-
Correct Answer
Jigs and fixtures required
Your Answer
Utilization of machine planned
Multiple Choice Single Answer
Question
This question refers to case on Uma Tools Pvt Ltd (UTPL)' : Presently the raw castings are procured by UTPL and given to machining to three vendors. If UTPL has to manufacture Exhaust Manifold in house it would have to provide one of the following:
Correct Answer
New jigs and fixtures
Your Answer
New jigs and fixtures
Match The Following
Question
Correct Answer
Your Answer
Mechanics going to clerk with requisition
Get the replacements authorization
Get the replacements authorization
This Question refers to the case of 'Kerson Automobiles' : Loss of productive time
Obtaining replacement of spares from stores
Obtaining replacement of spares from stores
Transfer of parts from work table to a hand trolley and pushing it out to the service bay
Blowing off parts clean with compressed air
Blowing off parts clean with compressed air
Space for storage of seats inside the workshop
Avoid wasteful movements
Avoid wasteful movements
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'The Irate Vendor' : The old supplier :-
Correct Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to discuss his bid
Your Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to discuss his bid , Is always asked his opinion about quantity to be ordered
True/False
Question
This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data sheet.
Correct Answer
True
Your Answer
True
True/False
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen noticed that each worker was provided with the drawing of the component.
Correct Answer
False
Your Answer
False
Select The Blank
Question
This Question refers to the case of 'Northern Machinery Limited' : The V.P. instructed Materials Manager to collect ________ information and evidence to clarify that their system is foolproof.
Correct Answer
Relevant
Your Answer
Relevant
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Autogears Private Limited' : Work elements performed by a gear shaving operator are :-
Correct Answer
Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the mandrel
Your Answer
Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the mandrel , Raise oil guard and switch on the machine
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Artwood Products' : The cost of manufacturing has increased due to :-
Correct Answer
Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of products
Your Answer
Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of products , Non availability of skilled labour
Select The Blank
Question
This Question refers to the case of 'K.T Gears' : The cycle time per piece to perform the set of activities listed adds up to ________.
Correct Answer
2.30 minutes
Your Answer
2.30 minutes
Select The Blank
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer Mr. Sinha informed Mr. Kaul that Employee ________ is very high.
Correct Answer
Turnover
Your Answer
Turnover
Multiple Choice Single Answer
Question
This Question refers to the case of 'National Engineering Co.' : As per GM, the route cause of this non-sensical situation is lack of :-
Correct Answer
Co-ordination
Your Answer
Co-ordination
Multiple Choice Single Answer
Question
This Question refers to the case of 'The Geer Company' : The company had a small foundry until 1946. This was subsequently closed and the purchase of ferrous castings were handled by :-
Correct Answer
A man who had been a supervisor in the foundry
Your Answer
A man who had been a supervisor in the foundry
Multiple Choice Multiple Answer
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : An incentive plan can be considered as a tool for following:-
Correct Answer
Increase productivity , Create more capacity , Reduce manufacturing costs
Your Answer
Increase productivity , Create more capacity , Reduce manufacturing costs , Increase sales
True/False
Question
This question refers to 'Automotive Gears Private Limited' : The table given in the casestudy gives approximate machine hour rate for each indicated machine.
Correct Answer
True
Your Answer
True
Select The Blank
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To manufacture exhaust Manifild in-house additional capacity is required. Extra capacity can be generated at UTPL by additional ________.
Correct Answer
Shift
Your Answer
Shift
True/False
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma, Production Engineer informed Mr. Kaul that Hardening & Tempering was the last operation.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'K.T Gears' : The firm is :-
Correct Answer
A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear
Your Answer
A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear , Engaged in manufacture of cutting gears
Multiple Choice Multiple Answer
Question
This question refer to the case on "Allied Industries Pvt Ltd" : Following are cost elements of make indicator :-
Correct Answer
Transport cost , Tooling cost , Indirect Employee cost
Your Answer
Transport cost , Tooling cost , Indirect Employee cost , Power cost
True/False
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen was informed by Mr. Ravikant, Materials Manager that counting is not necessary at every stage as they count at the initial stage and since their workers and supervisors are experienced, they can easily identify the components at each stage of production.
Correct Answer
True
Your Answer
True
True/False
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration can always be reduced by deploying additional recourses.
Correct Answer
False
Your Answer
False
Select The Blank
Question
This Question refers to the case of 'Narmada Electricals Ltd.' : The disposal of material was done on ________ basis.
Correct Answer
Weight
Your Answer
Weight
Select The Blank
Question
This Question refers to the case of 'National Engineering Co.' : GM commented that every department in this company competes with others in matter of ________.
Correct Answer
Inefficiency
Your Answer
Inefficiency
Select The Blank
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in execution of project leads to cost ________.
Correct Answer
Overrun
Your Answer
Overrun
True/False
Question
This Question refers to the case of 'Artwood Products' : It is necessary to keep stock of standard furniture to cater to sudden requirement of the customers.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
This Question refers to 'Automotive Gears Private Limited' : The company, for its various items, has recently introduced the concept of :-
Correct Answer
Economic lot size
Your Answer
Economic lot size
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Narmada Electricals Ltd.' : Other material considered to be scrap/obsolete is :-
Correct Answer
Packing material , Maintenance spares , Parts/components
Your Answer
Packing material , Maintenance spares , Parts/components , Electric motors
True/False
Question
This Question refers to the case of 'Kerson Automobiles' : MD has agreed to carry out modification of existing plant.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
This Question refers to the case of Narmada Electricals Ltd.: G.M. recruited a senior purchase manager, Mr. Sajid Durrani in the purchased department :-
Correct Answer
In view of need to procure parts/components for development in time
Your Answer
In view of need to procure parts/components for development in time
Multiple Choice Single Answer
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Following was the solution conceived by the Production Manager to the need of increasing production:-
Correct Answer
Introduction of incentive scheme
Your Answer
Introduction of incentive scheme
Select The Blank
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Overtime must be ________ to guarantee the success of the wage incentive scheme.
Correct Answer
Eliminative
Your Answer
Eliminative
Multiple Choice Multiple Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is manufactured in house, following costs wll increase:-
Correct Answer
Cost of power , Cost of labour , Cost of consumables like grease, lubricant
Your Answer
Cost of power , Cost of labour , Cost of consumables like grease, lubricant , Fixed overheads
Multiple Choice Single Answer
Question
This Question refers to the case of 'The Geer Company' : The purchase of steel was done exclusively by :-
Correct Answer
One buyer
Your Answer
One buyer
Multiple Choice Single Answer
Question
This Question refers to the case of 'Kerson Automobiles' : Cars are manually pushed over the wooden stand placed in the major repairs section because of :-
Correct Answer
Absence of the underground pit
Your Answer
Absence of the underground pit
True/False
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : Under Scanlon Plan employee is paid incentive bonus based on individual efforts and additional output.
Correct Answer
True
Your Answer
True
True/False
Question
This Question refers to the case of 'The Geer Company' : During the period of rapid expansion, it became necessary to subcontract a significant volume of machining operations.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
This Question refers to the case of 'K.T Gears' : The groove cutting operation is performed at the :-
Correct Answer
Capston lathe
Your Answer
Capston lathe
Multiple Choice Single Answer
Question
This question refer to the case on "Allied Industries Pvt Ltd" : Following cost element is considered while calculating total cost of buying :-
Correct Answer
Transport cost
Your Answer
Transport cost
Multiple Choice Multiple Answer
Question
This Question refers to the case 'Indus Foundries Ltd.' :Following items are readily available at all the three locations :-
Correct Answer
Raw materials , Scrap , Foundry chemicals
Your Answer
Raw materials , Scrap , Foundry chemicals , Manpower
Match The Following
Question
Correct Answer
Your Answer
Capacity cost
Unabsorbed overheads
Unabsorbed overheads
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Power cost
Variable over head
Variable over head
Setup cost
Fixed labour cost
Marginal cost
Material cost
Direct cost
Direct cost
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Northern Machinery Limited' : As per Materials Manager basis of awarding contract is :-
Correct Answer
Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P.
Your Answer
Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P. , Case to case basis
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the Activity description given in the table, Preparation of operational layout activity affects following activities :-
Correct Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge
Your Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge , Manufacture hobbing fixture
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Kerson Automobiles' : As per the MD, the company is faced with following problems :-
Correct Answer
Union leaders do not work , Lower efficiency of the mechanics, as they do not work at their place of work , Union leaders waste their time
Your Answer
Union leaders do not work , Lower efficiency of the mechanics, as they do not work at their place of work , Union leaders waste their time , Unsatisfactory layout
Multiple Choice Single Answer
Question
The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing of 500 nos of stay bolt. In the manufacturing process grinding operation is carried out on following machine :-
Correct Answer
Cylindrical grinder
Your Answer
Cylindrical grinder
Select The Blank
Question
This Question refers to the case of 'Artwood Products' : Entire shop floor was ________ due to piles of work in progress.
Correct Answer
Congested
Your Answer
Congested
Multiple Choice Single Answer
Question
This Question refers to the case of 'Hansa Tractomotive Ltd.' : The machines were completed by Kay Jee :-
Correct Answer
Within the stipulated delivery period
Your Answer
Within the stipulated delivery period
Select The Blank
Question
This Question refers to the case of 'Kerson Automobiles' : The pedestal grinder mounted on the huge work table, gives out ________ and blows out dust.
Correct Answer
Sparks
Your Answer
Sparks
Multiple Choice Single Answer
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Process sheet for exhaust manifold provides following information:-
Correct Answer
Jigs and fixtures required
Your Answer
Utilization of machine planned
Multiple Choice Single Answer
Question
This question refers to case on Uma Tools Pvt Ltd (UTPL)' : Presently the raw castings are procured by UTPL and given to machining to three vendors. If UTPL has to manufacture Exhaust Manifold in house it would have to provide one of the following:
Correct Answer
New jigs and fixtures
Your Answer
New jigs and fixtures
Match The Following
Question
Correct Answer
Your Answer
Mechanics going to clerk with requisition
Get the replacements authorization
Get the replacements authorization
This Question refers to the case of 'Kerson Automobiles' : Loss of productive time
Obtaining replacement of spares from stores
Obtaining replacement of spares from stores
Transfer of parts from work table to a hand trolley and pushing it out to the service bay
Blowing off parts clean with compressed air
Blowing off parts clean with compressed air
Space for storage of seats inside the workshop
Avoid wasteful movements
Avoid wasteful movements
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'The Irate Vendor' : The old supplier :-
Correct Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to discuss his bid
Your Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to discuss his bid , Is always asked his opinion about quantity to be ordered
True/False
Question
This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data sheet.
Correct Answer
True
Your Answer
True
True/False
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen noticed that each worker was provided with the drawing of the component.
Correct Answer
False
Your Answer
False
Select The Blank
Question
This Question refers to the case of 'Northern Machinery Limited' : The V.P. instructed Materials Manager to collect ________ information and evidence to clarify that their system is foolproof.
Correct Answer
Relevant
Your Answer
Relevant
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Autogears Private Limited' : Work elements performed by a gear shaving operator are :-
Correct Answer
Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the mandrel
Your Answer
Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the mandrel , Raise oil guard and switch on the machine
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'Artwood Products' : The cost of manufacturing has increased due to :-
Correct Answer
Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of products
Your Answer
Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of products , Non availability of skilled labour
Select The Blank
Question
This Question refers to the case of 'K.T Gears' : The cycle time per piece to perform the set of activities listed adds up to ________.
Correct Answer
2.30 minutes
Your Answer
2.30 minutes
Select The Blank
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer Mr. Sinha informed Mr. Kaul that Employee ________ is very high.
Correct Answer
Turnover
Your Answer
Turnover
Multiple Choice Single Answer
Question
This Question refers to the case of 'National Engineering Co.' : As per GM, the route cause of this non-sensical situation is lack of :-
Correct Answer
Co-ordination
Your Answer
Co-ordination
Multiple Choice Single Answer
Question
This Question refers to the case of 'The Geer Company' : The company had a small foundry until 1946. This was subsequently closed and the purchase of ferrous castings were handled by :-
Correct Answer
A man who had been a supervisor in the foundry
Your Answer
A man who had been a supervisor in the foundry
Multiple Choice Multiple Answer
Question
This question refers to case on 'Morbay Engineering Works (MEW)' : An incentive plan can be considered as a tool for following:-
Correct Answer
Increase productivity , Create more capacity , Reduce manufacturing costs
Your Answer
Increase productivity , Create more capacity , Reduce manufacturing costs , Increase sales
True/False
Question
This question refers to 'Automotive Gears Private Limited' : The table given in the casestudy gives approximate machine hour rate for each indicated machine.
Correct Answer
True
Your Answer
True
Select The Blank
Question
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To manufacture exhaust Manifild in-house additional capacity is required. Extra capacity can be generated at UTPL by additional ________.
Correct Answer
Shift
Your Answer
Shift
True/False
Question
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma, Production Engineer informed Mr. Kaul that Hardening & Tempering was the last operation.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
This Question refers to the case of 'K.T Gears' : The firm is :-
Correct Answer
A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear
Your Answer
A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear , Engaged in manufacture of cutting gears
Multiple Choice Multiple Answer
Question
This question refer to the case on "Allied Industries Pvt Ltd" : Following are cost elements of make indicator :-
Correct Answer
Transport cost , Tooling cost , Indirect Employee cost
Your Answer
Transport cost , Tooling cost , Indirect Employee cost , Power cost
True/False
Question
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen was informed by Mr. Ravikant, Materials Manager that counting is not necessary at every stage as they count at the initial stage and since their workers and supervisors are experienced, they can easily identify the components at each stage of production.
Correct Answer
True
Your Answer
True
True/False
Question
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration can always be reduced by deploying additional recourses.
Correct Answer
False
Your Answer
False
No comments:
Post a Comment